ASTM C 1283—07a Practice for Installing Clay Flue Lining (PDF Download)
The PDF/Redline Download option contains PDF files of both the I-Code and a Redline version of the I-Code which shows changes from the previous edition marked in the color red. With the Redline you can see what has been changed from the previous edition. This option is a searchable PDF download that requires a PDF Reader. It is mobile compatible with mobile tablets and smart phones that support the PDF format. The PDF Download is licensed per individual, who may place the file on up to four electronic devices for their personal use. Distribution of the PDF is not permitted. For a volume license the PDF is licensed to the person to which it is assigned. Use on a local area network or other network is not permitted.
This practice covers the minimum requirements for installing clay flue lining for residential concrete or masonry chimneys. Footings shall be constructed of concrete or solid masonry and the foundation shall be placed with respect to adjacent structures to minimize the possibility of damage. Both the concrete footings and foundations shall conform to local building codes. Flue liners shall be installed using refractory mortar in such a manner as to minimize ledges or steps within the flue passageway and shall be surrounded by masonry on all sides with a separation not exceeding the flue liner wall thickness. Materials used for chimney construction shall comprise of the following: flue linings, refractory mortar, concrete block, brick, mortar, firebrick, and natural stone. Chimney connection shall be made by either a metal or clay thimble while the chimney caps shall be made of precast or cast-in-place concrete, metal, or stone caps. Combustible materials shall be permitted to abut the masonry chimney sidewalls; wherein, the minimum air space clearance between the interior or exterior masonry chimneys and the combustible materials shall be met.
This standard is referenced in the 2012 International Building Code® and the International Residential Code®.
| Description: | This practice covers the minimum requirements for installing clay flue lining for residential concrete or masonry chimneys. Footings shall be constructed of concrete or solid masonry and the foundation shall be placed with respect to adjacent structures to minimize the possibility of damage. Both the concrete footings and foundations shall conform to local building codes. Flue liners shall be installed using refractory mortar in such a manner as to minimize ledges or steps within the flue passageway and shall be surrounded by masonry on all sides with a separation not exceeding the flue liner wall thickness. Materials used for chimney construction shall comprise of the following: flue linings, refractory mortar, concrete block, brick, mortar, firebrick, and natural stone. Chimney connection shall be made by either a metal or clay thimble while the chimney caps shall be made of precast or cast-in-place concrete, metal, or stone caps. Combustible materials shall be permitted to abut the masonry chimney sidewalls; wherein, the minimum air space clearance between the interior or exterior masonry chimneys and the combustible materials shall be met. This standard is referenced in the 2012 International Building Code® and the International Residential Code®. |
|---|---|
| Pages | 3 |
| Code Year | 2012 |
| Publisher | ASTM International |
| Language | English |